Applying power, Start-up status indications, Applying power -8 – Rockwell Automation 20-COMM-B BACnet MS/TP Adapter User Manual
Page 24

2-8
Installing the Adapter
Install or close the drive cover, and apply power to the drive. The adapter
receives its power from the connected drive. When you apply power to
the adapter for the first time, its topmost status indicator “PORT” should
be solid green after an initialization. If it is red, there is a problem. Refer
to
Start-Up Status Indications
Status indicators for the drive and communications adapter can be
viewed on the front of the drive (
Figure 2.7
) after power has been
applied. Possible start-up status indications are shown in
Table 2.B
.
Figure 2.7 Drive and Adapter Status Indicators (location on drive may vary)
Applying Power
!
ATTENTION: Risk of equipment damage, injury, or death exists.
Unpredictable operation may occur if you fail to verify that
parameter settings are compatible with your application. Verify that
settings are compatible with your application before applying power
to the drive.
PWR
STS
PORT
MOD
NET A
NET B
➊
➋