Figure 1.6 – Rockwell Automation LPM20 Liquid-Cooled AC Drive with High Performance Drive Control User Manual
Page 22

1-10
Installation/Wiring
Figure 1.6 Drive Input Dimensions
Verifying that Site Provides for Recommended Air Flow Clearances
Be sure there is adequate clearance for air circulation around the
user-supplied enclosure. A 6-inch minimum clearance is required wherever
vents are located in the cabinet.
For proper cabinet ventilation, roof spacers must be field installed as shown
in
81.11
[2060]
20.157
[512]
Area for Input Power Wiring
23.80
[605]
26.20
[665]
23.82
[605]
2.38
[60]
6.076
[154,3]
Left Panel/Divider Panel
Edge Guard
Field Install
Roof Spacers
Rittal p/n
DK7967.000
Exhaust Air
Space Required
Divider Panel
Rittal p/n
TS8609.060
Area for Input Power Wiring
10.49
[266]
58.48
[1485]
80.89
[2055]
78.99
[2006]
10.13
[257]
Ref
12.24
[311]
Left View Shown
with Lifting Eye-Bolts
as Shipped
C/B
Disconnect
Handle
Rittal TS8 Enclosure
600mm x 600mm x 2000mm
Power Cable
Opening Input
to Power Module
Intake Louver
323mm x 323mm
Control Cable
Opening Input
to Power Module