Component Installation 2-23

1503-IN050D-EN-P – June 2012

Required Hardware:
• three (3) horizontal bus links or suitable cable and lugs (bus links are

recommended to be 1/4 in. (6mm) thick and 1 in. (25mm) wide)
• six (6) 3/8-16 in. x 1 in. (M10 x 1.5 x 25mm) bolts

• six (6) 3/8-16 in. (M10 x 1.5) nuts

• six (6) 3/8 in. (M10) lock washers

• twelve (12) 3/8 in. (M10) fl at washers

1) Attach the bus links or cables to the line terminals on the trailer fuse

block (see Figure 2.21). Torque the bolts to the specifi cations shown on

page 1-4.

2) Attach the bus links, or suitable cable, to the line side of the contactor

(upper terminals) using 3/8 in. (M10) hardware. (See Fig. 2.21) Torque

the bolts according to the specifi cations shown on page 1-4.

Maintain at least 3 in. (76 mm) clearance between power

phase connections. Insuffi cient distance could cause

equipment damaging power faults in the unit.

Figure 2.21 – Linking Trailer Fuse Block to Contactor (Bolt-on Power Fuses)

A T T E N T I O N

A T T E N T I O N

Electrical Connection from

Contactor to Trailer Fuse Block

(Bolt-on Fuses)

Trailer Block Fuse

Contactor

Attachment Point

(Line Side)

Trailer Fuse Block

Attachment Point