Rockwell Automation 1784-PCC ControlNet Communication Card Installation Instructions User Manual
Page 86
![background image](/manuals/579352/86/background.png)
6-4 Run the 1784-PCC Test Utility in Windows 2000/XP, NT 4.0, and 95/98/Me
Publication 1784-IN034D-EN-P - June 2002
If there is an error, you will see a red X and an explanation.
.
Table 6.B
If you:
Then:
do not see six green check marks or you
do not see the message stating that the
1784-PCC completed all tests
successfully
• In Windows NT 4.0, run the setup utility again and
restart your computer.
• In Windows 95/98/Me and 2000/XP, go to Device
Manager and adjust resources.
are still getting an error
• Review the chapter for your operating system.
• Follow the instructions again. If you are still having
problems, contact your Rockwell Automation
service representative for assistance.
• Refer to the Preface of this manual for information
on Rockwell Automation Support.