Rockwell Automation 5370-CUPK Color CVIM USER-PAK Option User Manual

Page 20

Advertising
background image

Chapter 3

Installation

3 – 2

Figure 3.1 Inserting the USER-PAK Installation / Key card

ЗЗЗЗ

ЗЗЗЗ

ЗЗЗЗ

ЗЗЗЗ

ЗЗЗЗ

ЗЗЗЗ

ЗЗЗЗ

ЗЗЗЗ

ЗЗЗЗ

ЗЗЗЗ

ЗЗЗЗ

ЗЗЗЗ

ЗЗЗЗ

ЗЗЗЗ

ЗЗЗЗ

ЗЗЗЗ

USER-PAK
Installation/Key
card

Color CVIM
module face

Archive
Memory slot

Card Label

Metal Strip

Apply the power to the Color CVIM module; this starts the loading
sequence.

Do not remove power to the Color CVIM module during
loading of the USER-PAK option. Doing so may damage the
Color CVIM module.

ATTENTION:

!

The top three LEDs on the Color CVIM module indicate the progress of
the three-phase loading process, as follows:

USER-PAK Loading Phase

LEDs

1

2

3

Pass/Fail

Red-to-yellow-

to-green

Green

Red-to-yellow-

to-green

Trigger 1

Green

Green

Off

Trigger 2

Off

Green

Green

The loading process requires about 45 seconds, with each phase taking
about 15 seconds. When the loading process is complete, the Color
CVIM module begins its normal powerup sequence.

Advertising