Publication 2364E-5.01 April 2002

9-6

Installing Your NRU

NRU Checks After Power Up

1.

Verify that the incoming phase-to-phase line voltage is within the
specified tolerances:

2.

The common DC bus voltage will vary based upon the 3-phase
AC input voltage. Verify that the common DC bus voltage is
within the tolerances:

Note: We suggest that you check the DC bus voltage at the DC
bus energized board as shown in Figure 9.2
.

Figure 9.2
Where to Check the DC Bus Voltage

!

ATTENTION: You must not proceed with regular
operation if the NRU fails any of the checks described
in this section. Failure to do so may result in personal
injury and/or equipment damage.

Nominal AC Input

Voltage (V AC)

Minimum AC Input

Voltage (V AC)

Maximum AC Input

Voltage (V AC)

230

207

253

380

342

418

460

414

506

575

518

632

Nominal DC Bus

Voltage (V DC)

Minimum DC Bus

Voltage (V DC)

Maximum DC Bus

Voltage (V DC)

310

279

341

510

459

561

620

558

682

775

698

852