Publication GMC-RM001A-EN-P — July 2001

11-12

Measuring Noise Reduction Effectiveness

Monitoring Panels

To monitor your system panel:

1. Route a wire around all the clean zone wireways, ensuring that it

lays on top of all other wires (furthest from the panel).

2. Measure voltage peaks between one end of the wire and the

adjacent panel to assess E-field noise.

3. Repeat with the other end grounded to assess B-field noise.

4. Enable each potential noise source in turn to assess its

contribution if required.

Monitoring Systems

This is a good test of system HF bonding techniques. To monitor your
system:

1. Run wires connected to the metal structure of each remote panel

and machine frame to the main panel via the clean zone.

2. Measure voltage peaks between the wire and the adjacent main

panel to assess noise level.

Monitoring General System Conditions

If the wires are made permanent (preferably in a unique color) and
terminated with insulated terminals, useful long term measurements
may be made. To monitor for changes that may affect noise levels:

1. Document system noise levels during commissioning.

2. Re-check noise levels (for example) at twelve month intervals.

Check for deterioration due to corrosion of bond joints or
improper modifications to the wiring.

3. Check for reduced performance due to excessive noise levels

during service.

4. Re-check noise levels after modifications have been made.

An OEM could check for consistency in a series of machines
incorporating this into the quality procedures.