Unit Start-Up with WSHP Open Controls

The WSHP Open is a multi-protocol (default BACnet*) con-

troller with extensive features, flexible options and powerful

capabilities. The unit comes from the factory pre-programmed

and needs minimal set up to function in a BAS (Building Auto-

mation System) system or provide additional capabilities to

Carrier's WSHP product line. Most settings on the controller

have factory defaults set for ease of installation. There are a

few settings that must be configured in the field and several set-

tings that can be adjusted if required by unique job conditions.

Refer to Appendix A — WSHP Open Screen Configuration. In

order to configure the unit, a BACview

6

display is required. See

Fig. 35.
NOTE: If the WSHP Open control has lost its programming,

all display pixels will be displayed on the SPT sensor. See the

WSHP Third Party Integration Guide.

When the unit is OFF, the SPT sensor will indicate OFF.

When power is applied, the SPT sensor will indicate tempera-

ture in the space at 78 F.

To start-up a unit with WSHP Open controls:

1. To plug in the BACview

6

handheld display into a SPT

sensor,

point the two ears on the connector up and tilt the

bottom of the plug toward you. Insert the plug up into the

SPT sensor while pushing the bottom of the plug away

from you.

2. BACview

6

should respond with "Establishing Connec-

tion." The Home screen will then appear on the display

showing operating mode and space temperature. Press

any button to continue.
See Appendix A — WSHP Open Screen Configuration

for the hierarchal structure of the WSHP Open controller.

All functions of the controller can be set from the Home

screen.

3. When the Login is requested, type 1111 and push the OK

softkey. The Logout will then be displayed to indicate the

password was accepted.

4. To set the Clock if it is not already displayed:

a. Select System Settings from the Home screen, then

press Clockset.

b. Scroll to hour, minute and second using the arrow

keys. Use the number keypad to set actual time.

c. Scroll to day, month and year using arrow keys.

Use number keypad to set date.

5. To set Daylight Savings Time (DST):

a. Push the DST softkey. The display will indicate

02:00:060 which is equal to 2:00AM.

b. To program the beginning and end dates, scroll

down to the beginning month and press the enter

key. The softkeys (INCR and DECR) will activate

to increment the month in either direction, Jan,

Feb, March, etc.

c. Use number keys to select the day of month and

year.

d. Push the OK softkey to finalize the data.

6. To view configuration settings:

a. Select the Config softkey.
b. Select the Service Config softkey. Scroll through

the factory settings by using the up and down

arrow keys. See below for factory settings.
Only the following settings will need to be

checked.

• # of Fan Speeds — This should be set to "1" for

units with PSC motors and set to "3" for units with

ECM motors.

• Compressor Stages — This should be set to "1."

• Factory Dehumidification Reheat Coil — This

should be set to "none" unless the modulating hot

water reheat option is supplied in the unit, then set

to "installed."

• The condenser water limit needs to be verified

depending on design parameters and application,

whether geothermal or boiler/tower.

7. To view unit configuration settings:

a. Select the Unit Configuration softkey, then select

Unit.

b. Scroll through the unit settings by using the up and

down arrow keys. Unit settings include:

• Fan Mode: Default Continuous

• Fan Delay:

• Minimum SAT Cooling: Default 50 F

• Maximum SAT Heating: Default 110 F

• Filter Service Alarm: Must be set from 0 to 9999 hr

8. To set local schedules:

a. Select the Schedule softkey from the Configuration

screen, then press enter.

b. Select Weekly, then press enter (7 schedules

available).

c. Select day and press enter.
d. Press enter again and select ADD or DEL (DECR

or INCR) set schedule.

e. Enter ON/OFF time, then press continue.

Fig. 35 — BACview

6

Display Interface

a50-8444

*Sponsored by ASHRAE (American Society of Heating, Refrigerat-
ing and Air Conditioning Engineers).