Transmig vaf4hd – Tweco VAF4HD Transmig User Manual

Page 50

Advertising
background image

TRANSMIG VAF4HD

INSTALLATION, OPERATION AND SETUP

3-32

Manual 0-5269

2. Match regulator to cylinder. Before connecting, check that the regulator label and cylinder marking agree

and that the regulator inlet and cylinder outlet match. NEVER CONNECT a regulator designed for a particular

gas or gases to a cylinder containing any other gas.

3. Connect the regulator inlet connection to cylinder or pipeline and tighten it firmly but not excessively, with

a suitable spanner.

4. Connect and tighten the outlet hose firmly and attach down-stream equipment.
5. To protect sensitive down-stream equipment a separate safety device may be necessary if the regulator is

not fitted with a pressure relief device.

Operation

With the regulator connected to cylinder or pipeline, and the adjustment screw/knob fully disengaged, pressurize

as follows:

1. Stand to one side of regulator and slowly open the cylinder valve. If opened quickly, a sudden pressure

surge may damage internal regulator parts.

2. With valves on downstream equipment closed, adjust regulator to approximate working pressure. It is

recommended that testing for leaks at the regulator connection points be carried out using a suitable leak

detection solution or soapy water.

3. Purge air or other unwanted welding grade shielding gas from equipment connected to the regulator by

individually opening then closing the equipment control valves. Complete purging may take up to ten

seconds or more, depending upon the length and size of the hose being purged.

Adjusting Flow Rate

Art: A-05088_AB

Figure 3-32 Adjust Flow Rate

With the regulator ready for operation, adjust working flow rate as follows:

1. Slowly turn adjusting screw/knob in (clockwise) direction until the outlet gauge indicates the required flow

rate.

NOTE

It may be necessary to re-check the shielding gas regulator flow rate following the first weld sequence

due to back pressure present within shielding gas hose assembly.

2. To reduce flow rate, allow the welding grade shielding gas to discharge from regulator by opening the

downstream valve. Bleed welding grade shielding gas into a well ventilated area and away from any igni-

tion source. Turn adjusting screw counterclockwise, until the required flow rate is indicated on the gauge.

Close downstream valve.

Shutdown

Close cylinder valve whenever the regulator is not in use. To shut down for extended periods (more than 30 minutes).

1. Close cylinder or upstream valve tightly.
2. Open downstream equipment valves to drain the lines. Bleed gas into a well ventilated area and away from

any ignition source.

3. After gas is drained completely, disengage adjusting screw and close downstream equipment valves.
4. Before transporting cylinders that are not secured on a cart designed for such purposes, remove regula-

tors.

Advertising