Bleeding down-pressure hydraulics – Great Plains NTA3007 Operator Manual User Manual

Page 135

Advertising
background image

Great Plains Manufacturing, Inc.

Table of Contents

Index

Maintenance and Lubrication

131

2012-07-02

Table of Contents

Index

166-371M

Bleeding Down-Pressure Hydraulics
If the systems have sufficient fluid for safe operation,
prior to bleeding, perform unfold (page 34), tilt down
(page 39) and lower (page 42) operations. Set circuit to
Float.

1.

Review safety advisories and operational advice on
page 128, and on this page, before performing
bleed.

Refer to Figure 128
2.

Fully close bypass valve

and Transfer valve

.

Fully open Wing

and Centre

transfer valves.

Refer to Figure 129
3.

Un-pin six cylinder rod ends. Orient cylinders so that
rod ends may extend without striking drill parts.

4.

Fully retract cylinders. Set circuit to Neutral.

5.

Loosen the JIC fittings

at the base end of all

down-pressure cylinders.

6.

Slowly extend the circuit until fluid appears at a
loosened fittings. Set circuit to Neutral and secure
fittings. Repeat until all six fittings are secured.

7.

Fully extend cylinders. Set circuit to Neutral.

8.

Loosen the JIC fittings

at the rod end of all

down-pressure cylinders.

9.

Slowly retract the circuit until fluid appears at a
fitting. Set circuit to Neutral and secure fitting.
Repeat until all six fittings are secured.

10. Use tractor circuit to re-position rod ends and re-pin.

11. If bleeding is complete, restore bypass,

down-pressure and weight transfer valve settings
per:
See “Opener Down-Force (Hydraulic)” on
page 101.

Figure 128

Bleed: Down-Pressure Valves

29422

1

2

w

c

t

T

C

W

B

B

T

W

C

1

Figure 129

Fold Bleed Points

29484

2

2

1

2

1

2

2

2

1

1

1

2

2

Advertising
This manual is related to the following products: