Field operation, Seed monitor – Great Plains NTA3007 Operator Manual User Manual
Page 80
76
NTA907 or NTA3007
Great Plains Manufacturing, Inc.
166-371M
2012-07-02
Field Operation
Perform all steps in See “Pre-Start Checklist” on
page 33 and See “Final Field Checklists” on page 75.
Seed Monitor
The seed monitor performs the following functions:
• Drill lift switch monitoring
• Seed flow blockage
• Fan Speed monitoring
• Hopper material level monitoring
• Hopper air pressure monitoring
• Meter rate monitoring
(seed rate control, optional)
• Ground speed monitoring
Consult the DICKEY-john
®
Air Cart Control manual for
how to configure reporting and alerts.
Do not make short radius turns with the openers in the ground.
Note: If you stop in the middle of a pass, raise the drill
and back up 3 m (10 feet) before resumption of
seeding.
Begin Pass: Hydraulic Circuit Operation
Lift
Fan,
Auger
Fold, Tilt,
Marker
Transport
Hooks
Retract
Extend
Extend
then
Neutral
Neutral
Figure 79
CFM Marker Enable
29380
First Pass Operation Checklist
Page
1. Drill unfolded and aligned for first pass,
with opener discs about 3 m (10 ft.) before
field edge.
2. Run fan for at least 15 minutes before
planting.
3. CFM MASTER switch on
4. Unfold marker on next-row side.
5. Set fan hydraulic circuit to low flow,
engage circuit. Gradually adjust fan
hydraulic flow to obtain 3800 rpm.
6. Check seed monitor for alerts.
7. Pull forward, lower drill, and begin planting
for a short distance.
8. Stop. Assess:
• coulter depth
• planting depth
• press wheel operation
9. Make necessary adjustments
a.
Refer to Seed Rate manual.
Sharp Field Turns Checklist
Page
1. Fold marker
2. Raise drill
3. Make turn
4. Unfold marker on next-row side.
5. Lower drill 3 m / 10 feet before field edge
6. Resume planting.
Suspending Planting Checklist
Page
1. Stop tractor
2. Fan hydraulic circuit to Float or Neutral
3. Fold marker
4. Raise drill
Ending Planting Checklist
Page
1. Suspend operations as above, then
2. Set wing transport locks to ROAD
3. Tilt wings up
4. Set tractor for fold
5. Fold wings
6. Hook wings
7. Set mainframe transport locks to ROAD
8. CFM MASTER off
47
9. Beacon switch ON (NTA907 only)
10. Lights ON for transport