Appendix c - option installation, Changing meter flutes – Great Plains NTA3007 Operator Manual User Manual

Page 189

Advertising
background image

2012-07-02

Table of Contents

Index

166-371M

Great Plains Manufacturing, Inc.

Table of Contents

Index

185

Appendix C - Option Installation

Changing Meter Flutes

To order high rate or small seeds flute shafts, see
Alternate Flute Sets” on page 158. T
o install a set of
these shafts (or re-install the standard shafts), start with
the front meter, as the task is a bit easier there. Save all
parts for re-use.

Hopper must be empty for this procedure. see
Unloading Materials” on page 77.

Refer to Figure 174
1.

On both ends of the meter box, remove and save the
chain guard

and gear guard

.

Refer to Figure 175
2.

On the right end of the meter box, remove and save
the pins

from the final range gears

, and then

remove and save the gears. Note which size gear
was on the agitator output and flute input shaft.

Refer to Figure 176
3.

Remove and save the outer ring of six (6)
self-tapping hex head bolts

, that secure the outer

flange to the meter box.

Do not remove the six bolts

that secure the

bearing flangette to the outer flange. The shaft to be
installed includes its own flange.

Figure 174

Remove Guards

32414

Air Flo

w

2

1

1

2

Figure 175

Remove Gears

26337

4

3

3

4

3

4

Figure 176

Remove Flange Bolts

26338

6

5

5

6

Advertising
This manual is related to the following products: