Great Plains 3PYP Predelivery Manual User Manual
Page 22

18 3PYP
401-312Q
07/19/2011
Refer to Figure 27
15. Remove and save one set (not all shown):
803-006C NUT HEX 1/4-20 PLT
804-006C WASHER LOCK SPRING 1/4 PLT
802-167C HHCS 1/4-20X1 1/2 GR5
and remove the pin:
402-209H PIN 1 X 4 5/8 NONROTATE
16. Orient the cross-tube of the adjustment rod weld-
ment
so that the grease zerk is facing forward.
17. Continue swinging wheel forward until cross-tube
aligns with pin hole.
18. Re-insert pin. Secure with saved bolt
washer
and nut
.
19. Repeat this for the other gauge wheel assembly.
FigureSpacer:
Refer to Figure 28
20. Making sure to keep level from front to back and
side to side, slowly complete lowering the planter to
the ground.
21. Uncouple hoist lines, or lower forks and withdraw
lifters.
FigureSpacer:
Figure 27
Secure Gauge Wheel with Pin
29186
19
1
32
39
19
39
32
FigureSpacer:
Figure 28
Planter Lowered to Ground
25360