Benchmark 6000 DF Installation, Operation & Maintenance Manual

CHAPTER 10 – BOILER SEQUENCING TECHNOLOGY

OMM-0096_0B

AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913

Page 147 of 219

GF-141

Ph.: 800-526-0288

03/21/2014

10.3.4 Option 4 - Outdoor Reset with MODBUS Header Sensor AND MODBUS
Outdoor Sensor

NOTE: Both Header Sensor AND Outdoor Sensor must be wired. See the C-More Controller
User Manual, OMM-0032, GF-112 and ProtoNode User Manual, OMM-0080, GF-129 for more
information.

Step 1 - Modbus Header Sensor Wiring

1. Using Shielded pair 18 - 22 AWG cable, connect the Temperature Transmitter (AERCO P/N

65169) terminal Pin B to the RS485+ terminal on the I/O Box of any of the Boiler units, and
Pin A of the Temperature Transmitter to the RS485- terminal on the I/O Box of any of the
Boiler units.

2. Using Shielded pair 18 - 22 AWG cable, connect the Modbus Header Temperature Sensor

(AERCO PN 24410) to pins 2 and 3 of the Temperature Transmitter.

3. Install a jumper wire between pins 1 and 2 of the Temperature Transmitter.


NOTES:

• Polarity must be observed for the RS485 connections. The ground for the shield is at the

“SHLD” terminal in the I/O the Box.

• The header sensor must be installed between 2 and 10 feet downstream of the LAST boiler

in the plant’s supply water header.

• There is no polarity to be observed. The ground for the shield is at the power supply ground.

The sensor end of the shield must be left free and ungrounded.

Step 2 - Modbus Outdoor Sensor Wiring

1. If you have not already done so when installing the Modbus Header Sensor, use Shielded

pair 18 - 22 AWG cable to connect the Temperature Transmitter terminal Pin B to the
RS485+ terminal on the I/O Box of any of the Boiler units, and Pin A of the Temperature
Transmitter to the RS485- terminal on the I/O Box of any of the Boiler units.

2. Using Shielded pair 18 - 22 AWG cable, connect the Modbus Header Temperature Sensor

(AERCO PN 24410) to pins 2 and 3 of the Temperature Transmitter.

3. Install a jumper wire between pins 1 and 2 of the Temperature Transmitter.


NOTES:

• Polarity must be observed for the RS485 connections. The ground for the shield is at the

“SHLD” terminal in the I/O the Box.

• When mounting the Outdoor sensor, it must be located on the North side of the building

where an average outside air temperature is expected. The sensor must be shielded from
direct sunlight as well as impingement by the elements. The outdoor sensor may be wired
up to 200 feet from the boiler.