AERCO BMK 6000 Dual Fuel User Manual
Page 17

Benchmark 6000 DF Installation, Operation & Maintenance Manual
CHAPTER 2 – INSTALLATION
OMM-0096_0B
AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913
Page 17 of 219
GF-141
Ph.: 800-526-0288
03/21/2014
IMPORTANT
Ensure that adequate clearance exists at the rear of the unit to permit
installation and service maintenance of the AERCO Condensate Trap. Refer
to section 2.7 for Condensate Trap installation details.
When using the AERCO Condensate Neutralizer Tank for condensate
drainage, the tank must be installed in a pit, OR the boiler and AERCO
Condensate Trap must be elevated higher than 4” above the floor. See
Condensate Neutralizer Tank Instructions TID-0074 for details.
Figure 2-2a. Benchmark Boiler Model 6000 Clearances
Housekeeping pad
should not extend
under the condensate
assembly
4” – 8”
4” MINIMUM