CHAPTER 4 – INITIAL START-UP
Page 60 of 219
AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913
OMM-0096_0B
03/21/2014
Ph.: 800-526-0288
GF-141
4.2.1 Required Tools & Instrumentation
The following tools and instrumentation are necessary to perform combustion calibration of the
unit:
• Digital Combustion Analyzer: Oxygen accuracy to ± 0.4%; Carbon Monoxide (CO) and
Nitrogen Oxide (NOx) resolution to 1PPM.
• 16 inch W.C. manometer or equivalent gauge and plastic tubing.
• 1/4 inch NPT-to-barbed fittings for use with gas supply manometer or gauge.
• Small and large flat blade screwdrivers.
• Tube of silicone adhesive
4.2.2 Installing Gas Supply Manometer
The gas supply manometer (or gauge) is used to monitor the gas pressure on the downstream
side of the SSOV during the Combustion Calibration procedures described in sections 4.4 & 4-5.
The gas supply manometer is installed at the downstream location shown in Figure 4-1.
Figure 4-1: 1/4 Inch Gas Plug Location for Combustion Calibration
TO AIR/FUEL
VALVE
MANUAL SHUT-
OFF VALVE
DOWNSTREAM
SSOV with POC
SWITCH
PROPANE
LOW GAS PRESSURE
SWITCH (8.5” W.C.)
GAS
INLETS
NATURAL GAS
HIGH GAS
PRESSURE
SWITCH
(10.5” W.C.)
1/4" PLUG
(Install Manometer here for PROPANE Combustion Calibration)
NATURAL GAS
LOW GAS
PRESSURE
SWITCH
(8.5” W.C.)
PROPANE
HIGH GAS PRESSURE
SWITCH (6.3” W.C.)
1/4" PLUG
(Install Manometer
here for NATURAL
GAS Combustion
Calibration)