Change log – AERCO BMK 6000 Dual Fuel User Manual
Page 219
 
Benchmark 6000 DF Installation, Operation & Maintenance Manual
OMM-0096_0B
AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913
Page 219 of 219
GF-141
Ph.: 800-526-0288
03/21/2014
© AERCO International,
Inc., 2014
Change Log
Date
Description
Changed By
12/06/2013
Rev A: Initial Release
Chris Blair
03/20/2014
Rev B: 
PIR 942: Replaced 460V Power Box labels in 
section 2.9 
PIR 934-24: Increased max height of housekeeping 
pad to 8 inch (Chapter 2) 
PIR-960: Replaced all wiring schematics, addition of 
24V Sequencing Valve & Flame Rod Amplifier. 
PIR-934-31: Removed Dirt Trap from fig. 2-8. 
PIR-934-33: Modified step 13 in Combustion 
Calibration regarding defective O
2
Sensor
PIR-934-37: Modified Blocked Inlet Switch Test 
instructions, section 6.8.2. 
PIR-960: Addition of two sub-sections in 2.10.12; 
addition of section 2.15 Sequencing Valve 
Installation; addition of section 3.9 _BST Menu; 
addition of Chapter 10 – Boiler Sequencing 
Technology; replaced all wiring schematics in 
Appendix I, addition of 24V Sequencing Valve. 
PIR 934-45: Modified Appendix L – Recommended 
Spare Parts 
Chris Blair