3 accessing the analyzer probe port – AERCO BMK 6000 Dual Fuel User Manual

Page 61

Advertising
background image

Benchmark 6000 DF Installation, Operation & Maintenance Manual

CHAPTER 4 – INITIAL START-UP

OMM-0096_0B

AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913

Page 61 of 219

GF-141

Ph.: 800-526-0288

03/21/2014

Install the 16” W.C. manometer(s) as described in the following steps:

Installing Gas Supply Manometer

1.

Turn off the main gas supply upstream of the unit.

2.

Remove the top and front panels from the boiler to access the gas train components.

3.

To monitor the gas pressure on the downstream side of the SSOV during Combustion
Calibration (section 4.4 and 4.5), remove the 1/4” NPT plug from downstream side of the
SSOV as shown in Figure 4-1.

4.

Install a NPT-to-barbed fitting into the tapped plug port.

5.

Attach one end of the plastic tubing to the barbed fitting and the other end to the 16” W.C.
manometer.

4.2.3 Accessing the Analyzer Probe Port

For easy access, the unit contains a total of two (2) 1/4” NPT ports, on the left and right sides of
the exhaust manifold (see Figure 4-2).

Prepare the selected port for the combustion analyzer probe as follows:

Accessing the Analyzer Probe Port

1.

Refer to Figure 4-2 and remove the 1/4” NPT plug from the desired location on the exhaust
manifold.

2.

If necessary, adjust the stop on the combustion analyzer probe. DO NOT install the probe
at this time.

Figure 4-2: Analyzer Probe Hole Location

ANALYZER PROBE

PORTS

(2) with 1/4” PLUG

PARTIAL REAR VIEW

CONDENSATE
DRAIN

EXHAUST

MANIFOLD

Advertising