FingerTec TCMS V2 (Abridged Vesion) User Manual

Page 16

Advertising
background image

17

Work Day:

This will define the normal working days for your company.

By default, Monday to Saturday will be marked

Work day

.

Rest Day:

This will define the normal non-working days for your com-

pany. By default, Sunday will be marked

Rest day

.

Holiday:

This will define the non-working holidays for your company.

This is more appropriate for days such as public holidays.

Off Day:

This will define the non-working days for your company. This is

similar to a

Rest day

, but employs different wage rates than

Rest day

and

Holiday

. Use in accordance to your company’s policies.

5.1.3 Rounding Each Clocking Slot

At every clocking column, you can configure the

Round to nearest

minutes

option, which means that the attendance recorded will be

rounded into the nearest minutes as specified in the field. This function
works in tandem with the

Rounding

option below it.

Up:

Attendance time recorded is rounded up to the nearest minute.

E.g.: if

Round to nearest minute

is set to 15, all minutes will be rounded

up as per below: 1-15 minutes = 15, 16-30 minutes = 30, 31-45 minutes =
45, 46-59 minutes = 1 hour

Down:

Attendance time recorded is rounded down to the nearest

minute. E.g.: if

Round to nearest minute

is set to 15, all minutes will be

rounded down as per below:1-15 minutes = 0, 16-30 minutes = 15, 31-45
minutes = 30, 46-59 minutes = 45

Midpoint:

Attendance time recorded is rounded according to the mid-

point calculated. E.g.: if

Round to nearest minute

is set to 15, the mid-

point is 7 and the clocking schedule’s IN time is 9:00 am.

If the user verifies in less than 7 minutes after the IN time, for example

9:06 am, the software will round down the transaction data to be dis-
played as 9:00 am. If the user verifies more than 7 minutes after the IN
time, for example 9:08 am, the software will round up the transaction
data to be displayed as 9:15 am.

5.1.4 Rounding for fi rst-in and last-out for job costing only

There is a button where you can choose to apply Rounding for first-in
and last-out for the purpose of job costing, simplifying management’s
work in determining the price costing for each different task. Leave it
blank if you do not wish to use this rule in your attendance data.

Available for job costing:

For a sample solution on how to setup the job

costing feature for multiple different jobs, please refer to

www.fingertec.

com/newsletter/Feb2013/as-01.html

.

Advertising