3 wall mount plate mounting – Interlogix NS3550-8T-2S User Manual User Manual

Page 30

Advertising
background image

User’s Manual of NS3550-8T-2S

30

2.2.3 Wall Mount Plate Mounting

To install the Industrial Managed Switch on the wall. Please follow the instructions below.

Step 1:

Remove the DIN-Rail from the Industrial Managed Switch. Use the screwdriver to loosen the screws and remove the

DIN-Rail.

Step 2:

Place the wall mount plate on the rear panel of the Industrial Managed Switch.

Step 3:

Use the screwdriver to screw the wall mount plate on the Industrial Managed Switch.

Step 4:

Use the hook holes at the corners of the wall mount plate to hang the Industrial Managed Switch on the wall.

Step 5:

To remove the wall mount plate, reverse the steps above.

Advertising