Setting Up the Segment Controller

4. From the Street Light Bridge Installation page, click the button at the

top of the page to open the LON Scan Settings dialog.

5. Select the Predictive Scanning checkbox. You can also specify the

maximum hop count for repeating chains; the default is 8. Click OK to

close the dialog and return to the Lon Devices page.

8. From the Street Light Bridge Installation page, select the Continuously

checkbox to initiate continuous scanning. Alternatively, click Scan to

initiate a one-time scan. The Segment Controller discovers any

unconfigured devices (street light devices or CRD 3000 Street Light

Bridge modules) and commissions them.

Important: The Street Light Bridge Installation page (or browser tab)

must remain open while the predictive scan is in progress. Predictive

scanning can take some time to find all devices on the network. For a

large network, you might consider manually installing devices, as

described in Manually Installing a Street Lighting Network on page 48.

6. When all street light devices and CRD 3000 Street Light Bridge modules

have been successfully commissioned, deselect the Continuously

checkbox to return the Segment Controller to Operational Mode. You can

also close the Street Light Bridge Installation page and return to the

main Segment Controller page.

All devices that have been commissioned are automatically added to the Segment

Controller tree, under the LON icon.
While in Operational Mode, if you need to add devices to the street lighting

network, you can add them manually and use the Segment Controller Web pages

to commission them, as described in Chapter 5, Managing a Street Lighting

Network, on page 47.

Advertising