Setting devices offline – Echelon Lumewave CRD 3000 Street Light Bridge User Manual

Page 81

Advertising
background image

Street Light Bridge Integrator’s Guide

71

Alternatively, you can change the Commission Status property to

Uncommissioned from the Setup tab of the device Web page, which

appears when you select devices in step 1.

3. The Segment Controller places the devices in the soft-offline state (the

device has an application loaded and is configured, but it is offline) and

then unconfigures the devices. The offline devices are highlighted red in

the Segment Controller tree and in the Power Line Repeating Analysis

Web page.

4. To recommission an unconfigured device and place it back online, select

one or more devices to recommission, right-click a selected device, select

Manage, and select Commission from the shortcut menu. You then

select the devices again, right-click a selected device, select Manage, and

select Set Online from the shortcut menu.
Alternatively, you can select the Smart Network Management check

boxes for the Commission Status and Application Status properties

from the Setup tab of the device Web page, and click Submit. You can

also change the Commission Status property to Commissioned and

change the Application Status property to Application Running

(Online), and then click Submit.

Note: Changing the domain ID of the Segment Controller causes all the devices

on the network to be recommissioned automatically and reconfigured to the new

domain ID.

Setting Devices Offline

You can set a device on a power line repeating channel to the offline state in

order to stop running its application. You might want to set a device offline to

test the behavior of other devices on the network. An offline device still receives

Advertising