EXFO IQS-12002B Calibration System User Manual
Page 40
Operating Your Calibration System
36
Performing a Test
19. The application displays a preview of the report. It will also be possible
to print or export results afterwards (see Printing or Exporting Results
on page 37).
Note: To let the application consider the test sequence completed, you must
perform a print or export of the report. As long as this is not done, the
sequence will remains in the Open Sequence dialog windows and the
results will not be accessible in the DUT history or traceability reports.
When you have finished, click Close.
To launch an existing test sequence:
1. From the Operations menu, click Open Sequence.
2. Follow the instructions appearing on screen.
To resume a test sequence:
From the Operations menu, click Run Sequence.
The application will resume the test from where it stopped.
To change the default
location of the .pdf file