Vortech 2005-2009 Ford 4.6L 3V Mustang GT User Manual

Page 38

Advertising
background image

P/N: 8N020-120

© 2008 Vortech Engineering, LLC

All Rights Reserved, Intl. Copr. Secured.

23SEPT08v3.0(8N..120v3.0)MaxflowPwrClr

28

Fig. 3I-a

3I. COMPRESSOR BYPASS VALVE ASSEMBLY INSTALLATION (HO KITS ONLY)

A.

Assemble the bypass using a piece of 1"

hose cut to 11" long and a piece cut to 13"

long and four #16 hose clamps.

B.

Attach the 11" piece of hose to the inlet of

the bypass and secure with a clamp.

C.

Secure the 13" piece to the outlet of the

valve, securing it with a clamp. (See Fig.

3I-a.)

D.

Attach the bypass assembly to the charge

cooler. The 11" long piece will be attached

to the charge cooler. Secure with clamps.

Leave the 13" long section open for future

attachment to the air inlet.

11" x 1" HOSE

Ø

(TRIM TO FIT)

TO DISCHARGE

TUBE

13" x 1" HOSE

Ø

(TRIM TO FIT)

TO MANIFOLD PRESSURE/VACUUM

#16 HOSE CLAMPS

BYPASS

VALVE

TO INLET

DUCT

E.

Attach a length of 5/32" vacuum hose to the

bypass valve and route to the vacuum port

of the fuel rail sensor.

F.

Re-attach the vacuum hose from the

bypass valve to the TEE.

Advertising