Splay link of the frame, Þ chapter 2.9 – d&b V-Series User Manual

Page 17

Advertising
background image

2.9. Splay link of the frame

Splay link position
By factory default the Splay link is attached and parked to

«POSITION V8/V12».

Depending on the type of cabinet (V8/V12 or V-SUB) to be

attached to the Flying frame the position of the frame's Splay link

needs to be changed as described in the following section

Þ Changing the Splay link position.

Splay link of the frame – «POSITION V8/V12»

Splay link of the frame – «POSITION V-SUB»

Splay link park position
During transport the Splay link can be folded into its park position

and fixed using its Locking pin.

Splay link at park position – «POSITION V8/V12»

Splay link at park position – «POSITION V-SUB»

Changing the Splay link position

WARNING!
Potential risk of personal injury and/or

damage to material!

The fixing bolt

[B] of the frame's Splay link bears the full load of

the array.
It is essential that the bolt is fitted correctly and secured by a

locked ring cotter

[C].

To change the Splay link position, proceed as follows:

d&b V-Series Rigging manual (1.9 EN)

17

Advertising
This manual is related to the following products: