V8/v12 array – d&b V-Series User Manual

Page 23

Advertising
background image

3.2.1. V8/V12 Array
Preparations
For this type of setup the Splay link of the frame must be attached

to «POSITION V8/V12». Check the position and alter it if

necessary as described in Þ Chapter 2.9. " Splay link of the

frame" Þ " Changing the Splay link position" on page 17.

1. Prepare the first cabinet
Prepare the Front and Splay links of the first cabinet as described

in Þ Chapter 2.11. " Cabinet rigging mechanism" on page 19.

2. Attach the Flying frame to the first cabinet
1. Lower the frame onto the cabinet until the Front links fit into the

slots at the front of the frame.

2. Insert and lock the second Locking pins of the cabinet's Front

links on both sides.

3. Release the Locking pin that keeps the frame's Splay link in its

park position.

4. Fold out the Splay link and reinsert the Locking pin.

5. On the rear rigging strand of the cabinet, insert and lock the

first Locking pin of the cabinet in the

[0°] hole.

6. Slightly lower the frame and fold in the Splay link.
7. Lift the frame until the hook of the Splay link hooks into the

preset Locking pin.

8. Insert the second Locking pin (Safety pin) to secure the frame's

Splay link in place.

Splay link of the frame – «POSITION V8/V12»

d&b V-Series Rigging manual (1.9 EN)

23

Advertising
This manual is related to the following products: