d&b V-Series User Manual

Page 42

Advertising
background image

6. Lower the array slowly and evenly onto the cart until the Front

links are load-free.

7. Release the Locking pins of the Front links on the top cabinet of

the assembly while a second person renders support to

prevent the upper suspended assembly from unpredictable

swing.

8. Slowly lift the remaining assembly to allow the cart to be

turned or moved aside.

Proceed in the same manner until the array is completely

dismantled.

2. Reassembling the cart
1. Slide in the Front links of the top cabinet and reinsert the two

Locking pins.

2. Attach the connecting poles to the bottom tray and lock all

fasteners (CamLocks).

3. Attach the top lid and lock all fasteners (CamLocks).

Note: The top lids of the touring carts are equipped with

additional guiding tracks to fix the cabinet assemblies in place.

In conjunction with the E7463 V Touring cart 4 x V8/V12

observe the direction of attachment as shown in the graphic

below.

d&b V-Series Rigging manual (1.9 EN)

42

Advertising
This manual is related to the following products: