d&b V-Series User Manual

Page 29

Advertising
background image

4. Lower the assembly onto the frame until

the Front links fit into the slots at the front of the frame

and the Rear link fits into the track of the frame's center bar.

5. Insert the second Locking pins of the Front links on both sides.

6. On the rear rigging strand of the cabinet, insert the (first)

Locking pin of the cabinet's Rear link to the fixing hole of the

frame's center bar.

7. Release the Locking pin of the cable pick and insert it to the

second fixing hole of the frame's center bar.

3. Add V8/V12 cabinets below the SUBs
Adding V8/V12 cabinets below the SUBs is similar to the setup of

a flown V8/V12 array as described in .

4. Rig the cabling
1. Connect the flying cables and link cables according to the

number of amplifier channels and cabinets used.

2. Attach the cable pick.

5. Check the assembly
Before hoisting the array to its operating position recheck the

actual status of the entire assembly according to the checklist given

in Þ Chapter 4. "Safety and system checks" on page 39.

d&b V-Series Rigging manual (1.9 EN)

29

Advertising
This manual is related to the following products: