V-sub stack – d&b V-Series User Manual

Page 37

Advertising
background image

4. At the rear, release both Locking pins of the upper cabinet's

Splay link.

5. Preset the desired splay angle on the rear rigging strand of the

bottom cabinet using one Locking pin.

6. Fold the Splay link of the upper cabinet into the rigging strand

of the bottom cabinet.

7. Raise the upper cabinet until the hook of the Splay link hooks

into the preset Locking pin.

8. Hold the cabinet in place and insert the second Locking pin

(Safety pin) to fix the Splay link in place.

To add further cabinets, proceed in the same manner until the

assembly is completed.

6. Rig the cabling
Connect the flying cables and link cables according to the number

of amplifier channels and cabinets used.

7. Check the assembly
Recheck the actual status of the entire assembly according to the

checklist given in Þ Chapter 4. "Safety and system checks"

on page 39.

3.4.2. V-SUB stack
Limitations
A maximum of 8 x SUB cabinets are allowed to be set up as SUB

stack.

1. Assembly
Stack the SUB cabinets and interconnect them with their Front and

Rear links.

2. Rig the cabling
Connect the flying cables and link cables according to the number

of amplifier channels and cabinets used.

3. Check the assembly
Recheck the actual status of the entire assembly according to the

checklist given in Þ Chapter 4. "Safety and system checks"

on page 39.

d&b V-Series Rigging manual (1.9 EN)

37

Advertising
This manual is related to the following products: