3. Add further cabinets
1. Prepare the Front links of the next cabinet as described in

section Þ Chapter 2.11. " Cabinet rigging mechanism" on

page 19.

2. Lift the current assembly to a suitable working height.
3. Position the next cabinet below the assembly.
4. Lower the assembly onto the cabinet until the Front links of the

bottom cabinet fit into the slots of the upper cabinet.

5. Insert the second Locking pins of the cabinet's Front links on

both sides.

6. On the rear rigging strand, release the Locking pins of both

cabinets.

7. Fold out the Rear link of the upper cabinet.
8. Reinsert the Locking pin on the upper cabinet.
9. Fold the Rear link into the rigging strand of the bottom cabinet.
10. Reinsert the two Locking pins on the bottom cabinet.

To add further cabinets, proceed in the same manner until the

assembly is completed.

Splay option
The Front links of the SUB cabinets allow for a splay angle of 2.5°

between adjacent SUB cabinets. Before hoisting the array, the

angle can be set in two ways:

free

The second Locking pin of the cabinet's Front link is

inserted in the top hole of the front rigging strand as

shown in the graphic opposite. This can be done for

all cabinets in one step.

The angle opens itself as soon as the array is

hoisted.

blocked The second Locking pin of each cabinet's Front link

is inserted in the second hole cabinet by cabinet

during hoisting as shown in the graphic opposite.

Due to the design of the Front link mechanism, the

Locking pin can be inserted free of load.

SUB to SUB, 2.5° splay, free

SUB to SUB, 2.5° splay, blocked