d&b V-Series User Manual

Page 36

Advertising
background image

2. Change the position of the Cable pick
1. Release and remove the Locking pin of the Cable pick.
2. Unlock and remove the ring cotter of the fixing bolt.
3. Pull out the fixing bolt and take off the O-ring.
4. Attach the O-ring to its new position (hole 35) and insert the

fixing bolt.

5. Reinsert the ring cotter to secure the fixing bolt and ensure the

ring cotter is properly locked.

3. Attach the first cabinet to the frame
1. Place the cabinet onto the frame until the additional Front links

fit into the slots at the front of the cabinet.

2. Insert the second Locking pins of the additional Front links on

both sides.

4. Set the vertical aiming of the first cabinet
The hole grid on the Flying frame allows the first cabinet to be set

to a fixed vertical angle of –7°, –3.5°, 0°, +3.5° or +7°. The

hole (drill) of the cabinet's Splay link is used for this purpose. It

supports the cabinet and defines the angle setting.
1. Release the Locking pins of the cabinet's Splay link.
2. Fold out and insert the Splay link into the track of the center

bar of the frame and align the hole of the link with the desired

hole of the frame.

3. Fix the angle of the cabinet using the Locking pin of the Cable

pick.

5. Add further cabinets
1. Release the Locking pins of the Front links of the first cabinet.
2. Slide out the Front links and insert one Locking pin each to fix

them in place.

3. Attach the next cabinet to the Front links and insert the second

Locking pins on both sides.

d&b V-Series Rigging manual (1.9 EN)

36

Advertising
This manual is related to the following products: