Hardware preparation and installation, 1 overview, 2 unpacking and inspecting the board – Artesyn iVPX7225 Installation and Use (April 2015) User Manual
Page 39: 1 overview 2.2 unpacking and inspecting the board, Chapter 2, hardware preparation and installation, Outline, Chapter 2

Chapter 2
iVPX7225 Installation and Use (6806800S11C)
20
Hardware Preparation and Installation
2.1
Overview
This chapter describes:
Instructions for inspecting the board
Requirements that have to be observed when using the board
Installation and removal instructions
2.2
Unpacking and Inspecting the Board
Read all notices and cautions prior to unpacking the product.
Shipment Inspection
To inspect the shipment, perform the following steps.
1. Verify that you have received all items of your shipment which includes the
following but are not limited to:
Printed Quick Start Guide and Safety Notes
iVPX7225 board
Any optional items ordered
Damage of Circuits
Before touching the board or electronic components, make sure that you are working
in an ESD-safe environment.