5 Installation Procedure
22
YASKAWA TOEP YEACOM 07A 1000-Series Option PROFINET SI-EP3 Installation Manual
7.
Use the second communication cable port to daisy chain a series of drives where
applicable. Refer to
■
Connection Diagram
Figure 9 Wiring Diagram
8.
Replace and secure the front covers of the drive (F, I) and replace the digital
operator (G).
<1> The ground wire provided in the option shipping package must be connected during installation.
Yaskawa
Drive
M
U/T1
V/T2
W/T3
R/L1
S/L2
T/L3
SI-EP3
PROFINET
Option
FE
<1>
PROFINET Master
PROFINET Cable
Motor
Power
PROFINET Cable