5 Installation Procedure

22

YASKAWA TOEP YEACOM 07A 1000-Series Option PROFINET SI-EP3 Installation Manual

7.

Use the second communication cable port to daisy chain a series of drives where
applicable. Refer to

Figure 8

.

Connection Diagram

Figure 9 Wiring Diagram

8.

Replace and secure the front covers of the drive (F, I) and replace the digital
operator (G).

<1> The ground wire provided in the option shipping package must be connected during installation.

Yaskawa

Drive

M

U/T1
V/T2

W/T3

R/L1
S/L2

T/L3

SI-EP3

PROFINET

Option

FE

<1>

PROFINET Master

PROFINET Cable

Motor

Power

PROFINET Cable