In this test, the insulation is measured in five equal time periods with test voltages from one fifth
of the final test voltage up to full voltage (see the Fig. 22). This function illustrates the relationship
of a materials Insulation resistance and its applied voltage.

Measurement procedure:

• Connect the test leads to the instrument and to

the test object.

• Press the START/STOP key to start the

measurement.

• Wait until set timer runs out, (the result will be

displayed).

• Wait for the object under test to discharge.
• The results can be saved by pressing the MEM

key twice, see the section of Store, Recall and
Clear Operation.

Legend of displayed symbols:

STEP VOLTAGE

Name of selected function

Fil0 (Fil1, Fil2, Fil3)

Filter type enabled, see the section of Configuration

5000V

Set test voltage – step 125 V

U=5308V

Actual test voltage – measured value

I=266nA

Actual test current – measured value

19.9G

e

Insulation Resistance – result

C=1.2nF

Capacitance of measured object

Tm:05min 00s

Actual test duration

R1000V=20.0G

e

Last result of 1

st

step

R2000V=20.0G

e

Last result of 2

nd

step

R3000V=20.0G

e

Last result of 3

rd

step

R4000V=19.9G

e

Last result of 4

th

step

R5000V=19.9G

e

Last result of 5

th

step

U1=1077V

1

st

step voltage

U2=2142V

2

nd

step voltage

U3=3239V

3

rd

step voltage

U4=4283V

4

th

step voltage

U5=5308V

5

th

step voltage

Note

• Timer information is displayed from the start of the measurement until the completion of

each step measurement.

• Timer information shows the complete measurement period after the completion of the

measurement.

0

0.2U

0.4U

0.6U

0.8U

U

U

T

2T 3T 4T 5T

t

Fig. 22 Step-up test voltage