Amprobe AMB-110 Insulation-Resistance-Tester User Manual

Page 32

Advertising
background image

27

Displayed symbols:

WITHSTANDING VOLTAGE DC

Name of selected function

2000V

Start test voltage

7000V

Stop test voltage

7221V

Actual test voltage – measured value

I=0.002mA

Actual test current – measured value

tm:01min 00s

Timer information

Measuring procedure:

• Connect the test leads to the instrument and to the measured object.
• Press the START/STOP key to start the measurement.
• Wait until the set timers run out or until breakdown occurs, (the result will be displayed).
• Wait for the object under test is discharge.
• The result can be saved by pressing the MEM key twice, see the section of Store, Recall and

Clear Operation.

Note:

• Breakdown is detected when the measured current reaches or exceeds the set current level

trigger.

Notes:

• The timer shows the time needed to complete each step during the measurement and it shows

the total measurement period after the completion of the measurement.

• A high-voltage warning symbol appears on the display during the measurement to warn the

operator of a potentially dangerous test voltage.

Displayed symbols:

WITHSTANDING VOLTAGE DC

Name of selected function

SETTING PARAMETERS:

Ustart

2000V

Start test voltage, step = 25 V

Ustop

7000V

Stop test voltage, step = 25 V

Tstep

00min 00s

Duration of test voltage per one step

Tend

01min 00s

Duration of constant test voltage after reaching stop value

Itrigg

1.500mA

Set trigger leakage current, step = 10 A

Setting up the parameters of Withstanding Voltage DC Test:

• Press the SELECT key, (the set-up menu (Fig. 28) appears on the display).
• Select the parameter) to be set using the and keys;
• Adjust the parameter using the and keys.
• Complete the set-up adjustments by pressing either the ESC key or START key (to run the

measurement directly). The settings displayed last are stored.

Advertising
This manual is related to the following products: