Digital energy, Lp series – GE Industrial Solutions LP11U 5-10kVA User Manual

Page 12

Advertising
background image

LX: OPM_LPU_11U_5K0_10K_1US_V030

10

GE DE LP 11U UPS: Installation / User Manual 3.0 (US)

Digital Energy

LP Series

g

Ensure that the total power requirement of the equipment to be protected does not exceed the rated

output power of the UPS. (output power for your unit is indicated on the rating label on the rear panel).

When using the 120V split phase outputs make sure that the load per 120V output does not exceed half

the rating.

The UPS may only be installed by trained personnel. The UPS must be grounded when in use: Connect

the UPS to a single phase, three wire AC source equipped with an earth connection.

Use insulated copper input and output wiring, rated 90°C derated to 40°C, wire size based on the

ampacities given in Tables 310-16 of the National Electrical code, ANSI/NFPA 70-1993.

This wiring shall have the following minimum sizes:

INPUT

WIRING:

Utility

voltage

UPS model

120V 208V 240V

LP 5-11U

6 AWG

10 AWG

10 AWG

LP 6-11U

4 AWG

8 AWG

10 AWG

LP 8-11U

N/A

6 AWG

8 AWG

LP 10-11U

N/A

4 AWG

6 AWG

Table 2. Input wiring

OUTPUT

WIRING:

Output

voltage

UPS model

120V 208V 240V

LP 5-11U

8 AWG

10 AWG

10 AWG

LP 6-11U

8 AWG

10 AWG

10 AWG

LP 8-11U

6 AWG

8 AWG

8 AWG

LP 10-11U

4 AWG

8 AWG

8 AWG

Table 3. Output wiring

TIGHTENING TORQUE FORCE:

UPS model

Tightening torque force

LP 5/6-11U/120V

22 Lbs/inch

All other models

18-20 Lbs/inch

Table 4. Tightening torque force

Advertising