Digital energy, Lp series – GE Industrial Solutions LP11U 5-10kVA User Manual

Page 18

Advertising
background image

LX: OPM_LPU_11U_5K0_10K_1US_V030

16

GE DE LP 11U UPS: Installation / User Manual 3.0 (US)

Digital Energy

LP Series

g

4.5.3.3 Output voltage 220/230/240Vac

1. The factory setting of the output tap (208Vac) has to be changed to 240Vac. Follow the procedure as

described in section 4.5.3.2 steps 1.1 and 1.2.

2. Connect the load wires between the terminals 1 (L1) and 4 (N). Connect the ground wire to terminal 5.

Ground connection is essential! Do not remove the link between terminals 2 and 3. See figure 14.

3. Return to either 4.5.1.1 step 5 or 4.5.1.2 step 5

4.5.3.4 Output voltage 120Vac single phase

1. The factory setting of the output tap (208Vac) has to be changed to 240Vac. Follow the procedure as

described in section 4.5.3.2 steps 1.1 and 1.2.

2. Remove the link between terminals 2 and 3.
3. Place this link between terminal 1 and 2.
4. Place the extra link (delivered with the unit) between terminals 3 and 4.
5. Connect the load wires between connectors 1 (or 2) and 3 (or 4).

For LP 8/10kVA: If the wire size does not allow to place two wires (i.e. load wire and link) in one

terminal, proceed with step 8.

6. Connect the ground wire to terminal 5. Ground connection is essential!
7. Return to either 4.5.1.1 step 5 or 4.5.1.2 step 5.




Figure 14. LP 5/6/8/10-11U:

220/230/240 Vac output connection

Figure 15. LP 5/6/-11U:

120 Vac single phase output connection

Advertising