4.5.6 LP 11U series: 2 / 3 / 4 parallel operating units – additional info

The RPA option (Redundant Parallel Architecture) allows you to create a redundant UPS system in which 2, 3

or 4 LP-U units operate in parallel. The following should be considered when installing units in parallel.

This section gives aditional information on:

- installation (4.5.6.1)

- start-up (4.5.6.2)

- use / maintenance (4.5.6.3)

4.5.6.1 Notes concerning installation of a parallel system

1.

All inputs of the UPSs must be supplied from the same phase. This is to enable bypass operation of the

parallel system. All inputs must be individually protected by fuses in the installation. The values of these

fuses should correspond to the values mentioned in section 4.5 table 1.

2.

All outputs must be connected together, supplying the load. It is advised to install switches (S 1-4, fig. 17)

in the output wiring, in order to be able to isolate a unit from the remaining system for service and

maintenance purposes. It is advised to make a Neutral-to-Ground bounding in the output junction.

3.

The diameter of input and output cables must be according to the table in the installation drawings (see

appendix). Cables with different diameters can cause tripping fuses in the UPS and/or the installation.

4.

The length of all input cables from the input junction (Li, fig. 17) to the UPS inputs should be equal. The

same applies to the cables from the outputs to the output junction (Lo, fig. 17). The minimum length of

the input as well as the output cables is 3 meters / 10 feet.

Figure 17. Installation of parallel operating LP-U UPSs

F 1-4
DISTRIBUTION
FUSE VALUES
ACCORDING TO
TABLE 1

BUS

TERMINATOR

S 1-4
SWITCH ALLOWS
ISOLATION OF A UNIT
FROM THE SYSTEM

Li/Lo: LENGTH OF I/O WIRING
- EQUAL FOR EACH UPS
- MINIMUM 3 METERS / 9.8 FEET

MAKE
NEUTRAL-TO-GROUND
BOUNDING HERE

OUTPUT JUNCTION

TO LOAD

YELLOW NETWORK
CABLES AS DELIVERED
WITH THE UPS

BUS

TERMINATOR

INPUT JUNCTION

1-PHASE 3-WIRE INPUT

IN

OUT

LP-UPS

RPA CARD

IN

OUT

LP-UPS

RPA CARD

IN

OUT

LP-UPS

RPA CARD

IN

OUT

LP-UPS

RPA CARD

Advertising