GE DE LP 11U UPS: Installation / User Manual 3.0 (US)

Digital Energy

LP Series

g

Output tap changed to 240 Volt

(park)

(park)

(connect)

(park)

(park)

(connect)

Output tap factory setting: 208 Volt

4.5.3.2 Output voltage 120Vac split-phase


1. The factory setting of the output tap (208Vac) has to be changed to 240Vac. Please refer to fig. 12 and 12a.

Proceed as follows:

1.1 Remove the yellow wire L from faston 67 (connect) and place this wire on faston 65 (park).

1.2 Remove the brown wire F from faston 66 (park) and place this wire on faston 67 (connect).



























2. Connect the load wires between the terminals 1 (L1) and 2 (N) (120V), and between the terminals 3 (N) and

4 (L2) (120V). Connect the ground wire to terminal 5. Ground connection is essential! Do not remove the
link between terminals 2 and 3. See figure 13.

3.

Return to either 4.5.1.1 step 5 or 4.5.1.2 step 5

Figure 13. LP 5/6/8/10-11U:

120 Vac split-phase output connection

Figure 12a. LP 5/6/8/10-11U:

Rear view

Figure 12. LP 5/6/8/10-11U:

Output tap change