4.5.1 Installation

Procedures

4.5.1.1 Standard installation procedure:

input voltage 208-240Vac, output voltage 120/208/220/230/240Vac.

If a battery extension pack is to be installed, please proceed with section 4.5.5.

If 2, 3 or 4 parallel operating units will be installed, please proceed with section 4.5.6.

The numbers between (brackets) refer to figure 19 in section 5.1.

1. Mount the levellers: position A to fix the UPS to the

floor, position B to lift the castors from the floor.

2. Loosen the screws and remove the conduit box (17)

and the metal cover plate (11).

3. Make sure that all circuit breakers (7-8-9) are in ‘off’

position (down).

4. Input/output

connection:

Lead the input/output cables through the cable inlet. If

the cables come from below (recommended for 8kVA

and 10kVA models), you can rotate the cable inlet 90

degrees. Connect the input/output wires to the I/O

terminals (11a and 11b). Please refer to section 4.5.2

1 (input) and 4.5.3 (output) for detailed information.

5. Re-install the metal cover plate (11) and the conduit

box (17).

6. An emergency shutdown switch can be connected to

connector J3 on the RS232/Contact Interface Card,

between pins 3 and 4. See section 6.2 for more

information.

7. For advanced communication possibilities, the

RS232/contact interface port (12a) can be connected

to a computer system. See section 6.1 for more

information.

8. The middle ‘option slot’ (13) allows easy installation of

plug-in cards: SNMP Card or Relay Card. See

sections 6.3 and 6.4 for more information.

9. The right ‘option slot’ (14) allows easy installation of

the RPA-card (Redundant Parallel Architecture). If the

card is already mounted, and if the unit is intended to

be used stand-alone, a bus terminator (delivered with

the unit) has to be placed in one of the two bus

connectors on the card. If the unit will be part of a

parallel system, see sections 4.5.6 and 7.3 for more

information.

10. Connect the utility power to the UPS.

11. If hardware modifications were necessary in step 4

because the I/O voltages are different from the default

(208Vac), software modifications should be

performed as well. Proceed with 4.5.4.

12. For a quick start proceed with section 5.2 ‘Start-up’.

Figure 6. LP 5/68/10-11U:

Standard installation procedure

1

2

3

4

see 6.3-4

see 4.5.6 / 7.3

stand-alone
and RPA card
available

BATTERY
DISCONNECTED

EMERGENCY
SHUTDOWN

ON

OFF

5

6 7

8 9

Advertising