Assembly of the hinge cover (l), (r), Assembly of the lcd rear – Matsushita CF-W5LWEZZ1 2 User Manual

Page 47

Advertising
background image

47

9.3.2.18. Assembly of the Hinge Cover (L), (R)

Engages with LCD front
goods which have prepared
LCD rear

Refer to Figure 1

Refer to Figure 2

Refer to Figure 2

Multiply the fingernail

in 16 all places surely

SIMM cover WAN

Insertion

Antenna cover

Lock engagement

The fingernail in four places is inserted

PANASONIC LABEL

PANASONIC LABEL

Panasonic label

Cable drawing out route

Cable drawing out route

Safety work

Safety work

Safety work

Safety work

The cable is drawn out
between front and rear.

The cable is drawn out
between front and rear.

Hinge cover installation OK figure

Hinge cover installation NG figure

Hinge cover R

(Note)
Because the fixed lock medicine is used,
the screw cannot be repeated and be used.

Screw

Screw

Install the back pushing
when you tighten the screw.
(Left side is similarly executed.)
(Space generation prevention
of cover)

Screw

Screw

a

a

b

b

Hinge cover L

The cover externals and the
front rib are parallel
(agreement).

The cover externals are not
parallel to the front rib. Inclines.

The cable is processed under the axis.
It is confirmed that the cable does not narrow
between cabinets.

TP cable

The order of tightening screw:a b
Screw DRHM0076ZA

Safety work

The cable is processed under
the axis . It is confirmed that
the cable does not narrow
between cabinets.

Safety work

9.3.2.17. Assembly of the LCD Rear

Advertising