Assembly of the top case – Matsushita CF-W5LWEZZ1 2 User Manual

Page 75

Advertising
background image

75

Hook is hooked

When g is tightened, part is suppressed and tightened.

Screw
(DXQT26+D8FCL)

Screw (DXQT2+E6FCL)

Screw
(DXQT2+E6FNL)

Screw
(DXQT2+E6FNL)

Screw (DFHE5025XA)

Cable does not run
aground on pin.

Safety Work

Safety Work

Safety Work

Connection

Processes it
under the pin.

Cable does not
run aground.

Screw
(DXQT2+E6FNL)

The order of tightening screw : a J

Screw
(DXQT26+D8FCL)

Top case

Safety Work

Safety Work

Safety Work

Safety Work

Does not run
aground in the
LAN connector.

Neither WAN cable nor LAN
cable come in succession.

Does not run
aground in the rib.

Does not run aground
in the bottom rib.

Safety Work

Safety Work

The tool is inserted between
the bottom cases with cable.

Tool insertion chart

Does not run
aground in
the rib.

Does not run
aground in the
LAN connector.

Top Case
engagement

The connector
is connected.

The connector
is connected.

After connects the connector, and hinge
department Wiring is confirmed, top case is
installed in the bottom case.

It is confirmed that FFC is processed
straight when top case engages.

9.3.6.5. Assembly of the Top Case

Advertising