9.3.5. Assembly knowhow of the Bottom Case

9.3.5.1. Putting RJ Cable Bling Sheet / Hinge Buck Up Sheet / Cable Fix Sheet

Bottom case ass’y

Bottom cutting lack shape standard

Hits to the bottom in the cabinet and putting.

Hits to the cabinet corner and putting.

Puts only on this respect.
Other flaking off paper is not peeled off.

Left interior hinge part

The convex part is matched to
the shape of the cabinet and puts.

Hinge backup sheet

The cabinet heaven side is set
to the cushion heaven side.

Both sided
tape putting

Both sided

Both sided

tape putting

tape putting

Both sided
tape putting

RJ cable
blind sheet

Cable fix sheet

9.3.5.2. Setting Antenna Board and Line processing (1)

Safety work

<The tightening order>

DC jack is
installed
in bottom.

Processes with the boss
between ribs.

Processes to the
ditch of bottom.

It is confirmed that the
terminal becomes straight.

The board is made to
draw in the under and
screw is tightened.

Board is placed between
Bottom Case and installs.

Board is placed between
Bottom Case and installs.

Screw
DXQT2+E6FNL

It is confirmed that the screw hole of the board
is corresponding to the machine screw hole of bottom,
and tightens the screw.

a

b

Safety work

Safety work

When the screw is tightened,
the VGA connector is drawn
on and tightened.