Matsushita CF-W5LWEZZ1 2 User Manual

Page 63

Advertising
background image

63

9.3.4.6. Assembly of the Speaker

9.3.4.7. Line processing Speaker Cable and putting Speaker Sheet

SP cable fix cushion

Safety distance confirmation
Space securing in soldering part from rib

Marking of the safety distance confirmation is put.
The people other than the speaker affixation worker execute the safety distance.

So as not to stretch, the
cable is processed
(Room is given)

Edge side match

Speaker cable

Speaker

Soldering

Soldering

Solder must not overflow
Board externals.

Solder must not overflow
Board externals.

Black line

Red line

Safety work

Speaker

Speaker ring

Affix and kick according to the shape of the rib.
Note not running aground in the rib.

Rib

Rib

Rib

Rib

Inserts in the ditch

Management size : 2mm or more is secured.

Safety distance confirmation
Space securing in soldering part from rib
Management size : 2mm or more is secured.

Safety work

Safety work

Safety work

Processes along the wall.

Hits to the cable side

Management size : 0 1mm

Management size : 0 1mm

Speaker cable sheet

Speaker cable sheet

OK processing

Convex externals
match

Convex externals match

Speaker cable

Affixes to the
length wall

The extra is affixed
to the inner wall

Speaker cable processing

Speaker sheet

Plinth outside suiting

Plinth outside suiting

Diagonally processes

Process so as not to hang
in the corner hole

Safety work

Safety work

Safety work

NG processing

Diagonally processes

processes by the
cabinet corner
match

Affixes to the Flat place

Thing in which beginning to see
does not exist in square opening.

Advertising