Matsushita CF-W5LWEZZ1 2 User Manual

Page 80

Advertising
background image

80

9.3.6.11. The tightening screw of Bottom Case

9.3.6.10. Setting DIMM Cover

DIMM cover sheet

DIMM cover

DIMM cover is arranged
making not run aground
in screw tightening respect.

Rib application

DIMM heat sheet

For the cutting lack part to get
on the boss and so as not to go
up, affixation

Do not run aground on the edge
of the DIMM cover surroundings

The position where the DIMM cover and DIMM heat sheet
is put is this corner line match.

Put the
DIMM thermal sponge

(Space )

OK

NG

TOP

J18

Screw (a) : DXHM0039ZA
Screw (b) : DXHM0057ZA
Screw (c) : DXQT2+E12FNL
Screw (d) : DXQT2+E10FNL
Screw (e) : DXQT2+D4FNL
Screw (f) : DRHM0092ZA

Screw (a)

Screw (b)

Screw (b)

Screw (c)

Screw (d)

Screw (e)

Screw (f)

When the screw is tightened, the bottom
case is held and the tool is used.

The order of tightening screw :

Keyboard hook

Keyboard hook

(Refer to a left chart)

Does not run aground on the rib.

It is confirmed that cable is not narrowing with top case
between the bottom cases. LCD cable is exchanged if
narrowing.

~

b

b

Screw (DFHE5035ZB)

Screw (K1YE50000022)

The order of tightening screw : a d

Advertising