Matsushita CF-W5LWEZZ1 2 User Manual

Page 59

Advertising
background image

59

LAN cable

Boss

LAN cable

LAN cable is inserted under
LAN cable fix sheet.

LAN cable is processed
to boss’s interior.

Sheet is pulled in the direction
of the arrow and a two sided tape
is pasted.

LAN SW knob

Insertion after
installation of Main board

It is confirmed that SW lever
has been surely inserted in
the ditch of knob.

Insertion after installation
of Main board

Bottom case

Bottom case

WLAN SW

(OFF : Left side ON : Right side)

It is confirmed that WLAN SW has
become turning off (left side) before
building in bottom case.

LAN cable

Main board

LAN cable / antenna cable
is drawn out from the under
between boss A and B.

Boss A

Boss B

HDD FPC is inserted
under the board.

DVD FCC / coin battery cable
is drawn out from boss B the under.

Connector edge match

Pad button sheet

Cover pad SW surely.

Connector edge match

Advertising