Matsushita CF-W5LWEZZ1 2 User Manual

Page 73

Advertising
background image

73

9.3.6. Assembly knowhow of the Body

9.3.6.1. Setting LCD

9.3.6.2. Line processing LCD Cable (bottom case side)

Screw

Screw

b

a

LCD unit

The hinge is drawn up and the screw is tightened.

The order of tightening screw (DXQT26+D5FNL) : a b

Connection order

Inverter cable

LCD cable

Conductive cloth

Processes that cable should
not run aground on the DC-
jack holder.

Safety Work

Safety Work

Safety Work

Safety Work

Safety Work

Safety Work

Safety Work

Sheet’s edge and edge
are matched and put.
(The inclination part is
pressurized. )

The work order

Cable is processed under the
point hanging part.
(Floatage prevention)

Cable is processed to
the DC-jack holder.

Cable is processed
to the ditch.

Processes so that sheet should
not run aground in the screw
hole land.

(The figure below is state
after wiring)

VGA connector

Sheet

Cable

Bottom case

Main board

Screw hole land

Sheet must not
roll the holder.

The space is secured.

It is not possible to
recycle when flaking off.

Put the conductive cloth

Standard

Advertising