Figure 5-10 pcb module connectors – Lennox Hearth G8 User Manual

Page 97

Advertising
background image

11. Apply a drop of Loctite threadlocker to the screw

ends of the six standoffs and secure the new PCB to
the PCB module with the standoffs.

12. Reconnect the jack screws that you removed in

Step 9, reconnect the three connectors that you
removed in Step 8, and reinstall the PCB cover that
you removed in Step 7.

13. Reattach the PCB module to the antenna frame

using the module’s four captive screws.

14. Reconnect the cables that you removed in Steps 4

and 5. Be sure to reconnect all cables in their proper
positions. Figure 5-10 shows the proper connector
assignments.

15. Apply power to the antenna unit.

16. Type

HALT<cr>

(<cr> indicates a carriage return/

ENTER key).

17. Type

DEBUGON<cr>

.

18. Type

=TVG8<cr>

.

19. Type

=SERNUM,<serial number><cr>

, where

<serial number> = the system serial number you
recorded in Step 2.

20. Type

ZAP<cr>

to restart/reinitialize the system.

Maintenance

54-0198

99

POWER

ELEVATION GYRO

INTERNAL SENSOR

SKEW MOTOR

ELEVATION & AZIMUTH MOTORS

AZIMUTH/ROLL GYRO

LIMIT SWITCHES

FUSE

Limit

Switches

Internal

Sensor

Azimuth/Roll

Gyro

Elevation

Gyro

Power

Elevation & Azimuth

Motors

Skew Motor

Fuse

From LNB

BOTTOM

TOP

To IRD

Figure 5-10
PCB Module Connectors

Make sure the cable jacket passes
through the PCB cover’s access
slot within the rubber grommet to
protect the wires from the edge of
the PCB frame.

Advertising