Choke/iron, Troubleshooting and repair, Choke test procedure (continued) – Lincoln Electric INVERTEC SVM199-A User Manual
Page 94
Advertising
CHOKE/IRON
CHOKE/IRON
FIGURE F.14 – CHOKE ASSEMBLY
CHOKE TEST PROCEDURE (continued)
PROCEDURE
1. Using an Ohmmeter, make sure that the
choke windings are not grounded to the
lamination (> 1megohm).
TROUBLESHOOTING AND REPAIR
F-54
F-54
INVERTEC® V450-PRO
No windings or terminal connections should look
burned or over-heated. AC welding may cause
choke to buzz slightly.
Advertising