Installing the livegateway board, Power on self test (post) – PictureTel LIVE GATEWAY 3.1 User Manual

Page 11

Advertising
background image

Installing the LiveGateway Board

Electrical current from power, telephone, and signal cables is potentially hazardous. When
installing, moving, or opening your computer, disconnect all signal cables in accordance with
national and local laws. Do not connect or disconnect LiveGateway components when your
computer is on, as you might damage the LiveGateway hardware. To prevent electrostatic
damage to the board, do not disconnect the power cable from the computer

To install the LiveGateway board:

1. Power off the server.
2. Install the board in an available ISA or EISA full-length expansion slot, as shown below. Note: Your

board will have only one of the two switches shown in the illustration.

3. Connect the LiveGateway to the ISDN BRI by plugging the ISDN cable into the RJ45 socket on the

LiveGateway board.

4. Run the

Bootup Board diagnostics

. The Bootup Board Diagnostics program is provided on a separate

diskette that was provided with your LiveGateway kit.

Power On Self Test (POST)

Whenever the LiveGateway Service is started or restarted, LiveGateway performs a Power On Self Test
(POST). You can also perform the POST test from within the LiveManager gatekeeper application by using the
LiveGateway SNMP Manager which is accessible from both the File menubar and the toolbar of LiveManager.

Advertising